LIVE·SANTOS $1.2M demurrage accruing·58 anchored · median 50h·congestion $4.1/t·12.4Mt cargo at anchor·PARANAGUÁ $22.7M·45 ports · as of 2026-08-01 10:20 UTC
// JIT

Arrive to a berth, not to an anchorage.

Convert the wait forecast into a slow-steam recommendation: a realistic berth window to aim for, the idle time avoided, and the fuel and CO₂ saved. IMO puts full arrival optimisation at 14.16% fuel per voyage.

// Fuel & CO₂

−14.16% full optimisation (IMO GreenVoyage2050)

// Realistic windows

targets the simulated berth time, not a fantasy ETA

// EU ETS ready

carbon accounting for EU-bound legs

Included in Port Pro and Brazil Desk.

From $199/mo for one port, or $549/mo for all eight with unlimited seats.

See pricing